Full Commit To The Project

Full Commit To The Project

I was really exhausted at work. It was a big difference from the estimated volume that I had thought. In the evening, I gave up doing that then I contacted the client to report the current status. I had no choice, right? I had deep-fried gyoza and soured horse mackerel for dinner. I had mamushi liqueur too. I fell asleep at 10 p.m. I’m not sure, but due to the liquor, I had deep nightmares. I couldn’t recover even one percent of my energy.

  • PDF Artist Portfolio download
  • tricera, selling paintings art online
  • instagram follow me
  • tagboat,picture,painting,sale

当サイト内の文章・画像等の内容の無断転載及び複製等の行為はご遠慮ください。

Unauthorized copying and replication of the contents of this site, text and images are strictly prohibited. All Rights Reserved.

Copyright © 2012-2024 Shintaku Tomoni. All Rights Reserved.